Gas Pipeline Relocation Project for Fuquan Expressway Connector Widening

FuquanExpressway_GasPipeline_Relocation

Project Overview

This gas pipeline relocation is necessitated by the highway expansion of the Fuquan Expressway connector and planned Luocheng Road routing in Cangshan District, Fuzhou City. Approximately 1,450m of existing pipeline is encroached by planned ramps and roundabouts, with some sections directly beneath highway interchange pile foundations. The new route spans 1,821.7m (Pile AP-01 to AP-52).

Key Construction Details:

  • Reason: Ensure highway construction safety and pipeline operational integrity
  • Encroachment Type:
    • Highway ramps
    • Roundabout construction
    • Pile foundations
FuquanExpressway_GasPipeline_Relocation
FuquanExpressway_GasPipeline_Relocation
FuquanExpressway_GasPipeline_Relocation
FuquanExpressway_GasPipeline_Relocation

Pipeline Specifications:

ParameterValue
DiameterФ406×7.9mm
MaterialL415 steel
Design Pressure7.5 MPa
Operating Pressure4.0 MPa
ContentNatural gas
Coating3PE anti-corrosion

Project Timeline & Stakeholders:

  • Client: CNOOC Fujian Natural Gas Co., Ltd.
  • Duration: April 18 – May 18, 2023
  • Location: Qingliang Village, Chengmen Town, Cangshan District
FuquanExpressway_GasPipeline_Relocation