North American Microtunneling Job Log: The Projects That Define the Market
Microtunneling projects in North America are tracked through an annual trade-press job log of notable drives in the United States and Canada. Read together, the 1980s Florida first crossing, the 3,947 ft Painesville lake intake, Calgary’s 3.4 m storm pipe and Winnipeg’s 5,600 ft boulder drive map a market growing in diameter, length and difficulty.
North American Microtunneling Job Log: The Projects That Define the Market Baca Selengkapnya »










