Langsung ke isi
Logo JSW

Email:mhcbhlt@outlook.com

  • Beranda
  • Layanan
    • Layanan Pembangunan Pipa
      • Layanan Sistem Pengelasan Otomatis
      • Layanan Pengeboran Arah Horizontal
      • Pembengkokan Pipa dengan Metode Dingin
      • Mikrotunneling
      • Teknologi Tanpa Penggalian
    • Layanan Pemasangan Pipa
    • Perbaikan & Rehabilitasi
      • Layanan Pemasangan & Penutupan Pipa Tanpa Memotong
      • Layanan Perbaikan Pipa
      • Rehabilitasi Tanpa Penggalian
      • Layanan Perbaikan Pipa Eksternal
      • Layanan Perbaikan dan Pemeliharaan Pipa Darurat
    • Layanan Inspeksi Pipa
  • Proyek
  • Peralatan
  • Tentang
    • Profil Perusahaan
    • Melayani Sinopec & CNPC
    • Pameran Pabrik
    • Sertifikat
    • Berita
    • Blog
  • Hubungi Kami
Dapatkan Penawaran
Dapatkan Penawaran
Logo JSW
  • Beranda
  • Layanan
    • Layanan Pembangunan Pipa
      • Layanan Sistem Pengelasan Otomatis
      • Layanan Pengeboran Arah Horizontal
      • Pembengkokan Pipa dengan Metode Dingin
      • Mikrotunneling
      • Teknologi Tanpa Penggalian
    • Layanan Pemasangan Pipa
    • Perbaikan & Rehabilitasi
      • Layanan Pemasangan & Penutupan Pipa Tanpa Memotong
      • Layanan Perbaikan Pipa
      • Rehabilitasi Tanpa Penggalian
      • Layanan Perbaikan Pipa Eksternal
      • Layanan Perbaikan dan Pemeliharaan Pipa Darurat
    • Layanan Inspeksi Pipa
  • Proyek
  • Peralatan
  • Tentang
    • Profil Perusahaan
    • Melayani Sinopec & CNPC
    • Pameran Pabrik
    • Sertifikat
    • Berita
    • Blog
  • Hubungi Kami

Proyek

Pipeline Repair Projects

Pipeline Service
Workers operating equipment in enclosed excavation pit during petroleum pipeline repair, part of pipeline shutdown operation and hot tapping and plugging process

Safe Replacement of an Encroached DN400 Petroleum Pipeline in Hunan Using Advanced Hot Tapping and Plugging Services

Pipeline Encroachment Remediation: Equipment setup for pipeline replacement at Xianggan Wuxin pipeline project site

High-Stakes Pipeline Encroachment Remediation – The Huxi Ancestral Hall Pipeline Relocation Project

Pipeline Repair under Pressure: Workers operating isolation plugging equipment at night for Zhanjiang high-speed railway pipeline relocation

High-Pressure Hot Tapping & Plugging for Guangzhou-Zhanjiang High-Speed Rail Project

Construction site of Riyi crude oil pipeline plugging project in Rizhao: Workers, cranes, and large-diameter pipeline in the excavated trench during weld defect replacement and repair works.

Successful In-Service Repair of a Critical DN900 Crude Oil Pipeline Using Advanced Hot Tapping and Stoppling

Workers, excavator and pipeline at Yubei LNG emergency reserve center pipeline relocation construction site in Jiaozuo, Henan

Critical Natural Gas Pipeline Relocation via Live-Line Hot Tapping & Stoppling

Workers in red work clothes install large-diameter pipeline (for natural gas/oil pipeline relocation project) at construction site, Suqian, Jiangsu

Safely Relocating a Live High-Pressure Gas Pipeline for a Critical Road Expansion

On-site construction of Wenchao Canal pipeline relocation project for refined oil and jet fuel.

Strategic Relocation of Critical Fuel Pipelines for Beijing’s Wen-Chao Jian River Project

Our pipeline construction team and equipment mobilized at the Ulanqab project site, showcasing early-stage project preparation and organization for the DN500 natural gas pipeline installation.

DN500 Pipeline Installation & Directional Drilling Project in Ulanqab

A certified welder executing a high-integrity weld on the 1.6 MPa natural gas pipeline, showcasing our pipeline engineering services expertise.

Yingsheng Road East Section Sub-high Pressure Natural Gas Pipeline Engineering Services

Specialized hot tapping equipment operating on live 2.2MPa natural gas pipeline, enabling zero-interruption relocation technology.

Live Tapping for Hunan Zhongyou Gas High-Pressure Natural Gas Pipeline Relocation

Jinshiwan engineers conducting a pre-construction field survey to verify pipeline material and conditions, a critical first step for project success.

Precision Pipeline Relocation for Xiongshang High-Speed Rail Ensuring Zero Production Shutdown

A certified technician bolts a specialized hot tapping machine onto the live natural gas pipeline, the first critical step in our pipeline stoppling system.

Pipeline Hot Tapping & Stoppling Services on the Xiongan Gas Pipeline Project

« Previous Halaman1 Halaman2 Halaman3 Halaman4 Next »

Trust and Worth

Our Clients

yanchang Petroleum
Towngas
SSTPC
Sinopec
SECCO
NOOC
ENN Group
China Resources Gas
China Oil & Gas Pipeline Network Corporation
Perusahaan Minyak Nasional Tiongkok
Sinopec
Perusahaan Minyak Nasional Tiongkok
Kontraktor Resmi untuk Sinopec & PetroChina

Sebagai mitra lapangan tepercaya bagi perusahaan-perusahaan energi terkemuka di Tiongkok, kami menyediakan layanan perbaikan dan pemeliharaan pipa yang profesional. Teknisi bersertifikat kami mengkhususkan diri dalam teknologi hot-tapping dan selongsong komposit, serta menawarkan solusi yang cepat, andal, dan seminimal mungkin mengganggu operasional Anda agar tetap berjalan dengan aman—24 jam sehari, 7 hari seminggu.

Layanan Kami
  • Penyedia Jasa Pipa yang Disetujui oleh Sinopec & CNPC 
  • Layanan Penyambungan dan Penutupan Pipa
  • layanan pemasangan pipa
  • Layanan Perbaikan Pipa
  • Perbaikan pipa eksternal
  • Rehabilitasi Tanpa Penggalian
  • Layanan Inspeksi Pipa
  • Layanan Tanggap Darurat dan Pemeliharaan Darurat pada Jaringan Pipa
  • Teknologi Tanpa Penggalian
  • Pembengkokan Pipa dengan Metode Dingin
  • Mikrotunneling
  • Layanan Pengeboran Arah Horizontal
  • Layanan Sistem Pengelasan Otomatis
Kontak Departemen

Telp: +8615303177619

Email: mhcbhlt@outlook.com

  • Departemen Pengembangan Bisnis
    Wang Lipeng: +86 138 3174 3777
  • Departemen Manajemen Teknik
    Li Chunjiang: +86 139 3079 9177
  • Departemen Manajemen Proyek
    Zhang Qingxian: +86 138 3371 7917

Unit 1613, Lantai 13, Gedung 3, Jl. Beiqing No. 1, Distrik Changping, Beijing, Tiongkok

Jam Layanan

Senin - Minggu: 08.00 - 17.30 (Standar)
Layanan Tanggap Darurat 24 Jam Setiap Hari Tersedia

Hak Cipta © 2026 JSW Pipeline Service

We've detected you might be speaking a different language. Do you want to change to:
Ubah bahasa ke English English
Ubah bahasa ke English English
Ubah bahasa ke Arabic Arabic
Ubah bahasa ke Russian Russian
Ubah bahasa ke Spanish Spanish
Ubah bahasa ke French French
Ubah bahasa ke Vietnamese Vietnamese
Ubah bahasa ke Polish Polish
Ubah bahasa ke Thai Thai
Indonesian
Ubah bahasa ke Turkish Turkish
Ubah bahasa ke Portuguese Portuguese
Change Language
Close and do not switch language

Notifikasi