Projects

Pipeline Hot Tapping & Stoppling Services on the Xiongan Gas Pipeline Project

A certified technician bolts a specialized hot tapping machine onto the live natural gas pipeline, the first critical step in our pipeline stoppling system.

Project Snapshot

  • Client: Xiongan New Area Energy Development Group
  • Location: Xiongan New Area, Hebei Province, China
  • Industry: Oil & Gas / Energy Infrastructure
  • Key Challenge: Execute critical tie-in and valve installation on a high-pressure natural gas trunk line without interrupting the gas supply to the newly developed urban area, thereby avoiding massive economic and social impact.
  • Our Solution: A comprehensive, engineered Pipeline Hot Tapping & Stoppling plan, utilizing advanced isolation plugs and a temporary bypass system to maintain gas flow during the modification.
  • Key Results:
    • Zero supply interruption to end-users.
    • Completed within a 48-hour critical window.
    • 100% safety record with zero incidents.
    • Estimated economic loss prevention: >$5 Million USD.

The Critical Challenge: Modifying a Live Artery of a Modern Metropolis

The Xiongan New Area is a landmark national project in China, a modern city built from the ground up. Its energy infrastructure, particularly the high-pressure natural gas pipeline network, is its lifeline. Any disruption in supply would not only mean financial loss for the utility but would also halt construction, affect residential supply, and impede the development of this strategic zone.

The client, Xiongan New Area Energy Development Group, faced a formidable engineering challenge. The Phase II West Extension spur of the main gas line required a critical tie-in to connect a new industrial zone. Traditional methods would necessitate a complete shutdown of the pipeline—an unthinkable option that would cost millions per day in stalled economic activity and create significant social disruption.

The core requirements were absolute:

  1. Zero Interruption: The gas supply must continue unabated throughout the entire operation.
  2. Maximum Safety: Working on a live, pressurized gas line demanded the highest safety standards to prevent catastrophic failure.
  3. Precision & Speed: The operation had to be completed within an extremely tight 48-hour window to align with the overall project schedule.

This was a scenario where standard pipeline repair methods were insufficient. The solution demanded specialized pipeline hot tapping & stoppling services.

Certified technician bolting a specialized hot tapping machine onto the live natural gas pipeline during the Xiongan project.
Close-up view of the stoppling isolation plug being inserted into the pipeline through the hot tap valve under engineer supervision.

Our Engineered Solution: A Symphony of Precision and Pressure Management

As a leading provider of pressurized pipeline intervention solutions, we were engaged to design and execute a flawless hot tapping and stoppling procedure. Our approach was a customized, multi-stage plan focused on safety and continuity.

The Core of Our Pipeline Stoppling System:

  1. Hot Tapping (The Entry Point): We first performed a hot tapping procedure on the main pipeline. This involves mechanically drilling into the live pipe while it remains in full service, using a specialized tapping machine and a pressure-containing valve. This creates a safe access point without leaking a single molecule of gas.

  2. Stoppling (The Isolation): Following the tap, we deployed the core of our pipeline stoppling technology—an isolation plug. This sophisticated device is inserted through the tap valve and expanded internally to form a perfect seal, effectively isolating the downstream section slated for modification.

  3. Bypass Piping (Maintaining Flow): To ensure gas continued to flow to the end-users, we installed a temporary bypass piping system that rerouted the gas around the isolated work section.

Our solution leveraged state-of-the-art equipment from industry leaders, ensuring reliability and precision. This non-disruptive pipeline maintenance strategy transformed a potentially city-disrupting event into a controlled, managed engineering operation.

Temporary bypass piping system installed to maintain continuous gas flow around the isolated work section.
Team of certified pipeline engineers monitoring pressure gauges during the critical tapping and plugging operations.

The Implementation: A Showcase of Expertise and Meticulous Execution

Our field team, comprising certified pipeline services engineers and technicians, executed the plan with military precision. The process underscored our deep pipeline integrity expertise.

  • Phase 1: Preparation & Fit-Up: The pipeline section was extensively surveyed, and the hot tapping and stoppling equipment was fitted and pressure-tested offline to ensure flawless field performance.

  • Phase 2: Critical Tapping & Plugging Operations: Under the continuous monitoring of our engineers, the hot tapping was completed successfully. The isolation plug was then set, verified, and pressure-tested to confirm a bubble-tight seal. This was the highest-risk phase, managed with rigorous safety protocols.

  • Phase 3: Modification & Reinstatement: With the line safely isolated, the client’s construction team proceeded with the tie-in and valve installation. Once completed, we sequentially retracted the stopple plug, reinstated the flow through the main line, and safely removed all temporary equipment.

Throughout the 48-hour window, our project management team maintained constant communication with the client, providing real-time updates and ensuring complete alignment.

Completed tie-in connection and valve installation on the Xiongan gas pipeline after successful stoppling procedure.

Quantifiable Results & Lasting Benefits

The success of this pipeline hot tapping and stoppling services project was measured in hard data and client satisfaction.

  • Zero-Downtime Achievement: The gas supply to the Xiongan New Area was maintained at 100% capacity. We estimate this prevented over $5 Million USD in potential economic losses.

  • Impeccable Safety Record: The project was completed with a 100% safety record, zero incidents, and zero environmental emissions.

  • On-Time Delivery: All work was completed within the strict 48-hour schedule, preventing any cascading delays to the broader construction project.

  • Enhanced Infrastructure Longevity: The new tie-in was installed without compromising the structural integrity of the existing pipeline, extending its service life.

A Word from Our Client:

“The complexity and stakes of the Xiongan pipeline tie-in were immense. Shutting down the line was not an option. JSW team demonstrated why they are leaders in live pipeline modification. Their technical expertise was evident from the planning stage, and their execution was flawless. They turned our biggest project risk into a textbook example of successful engineering. We would not hesitate to partner with them on future energy infrastructure projects.”

— Mr. Zhang Wei, Project Manager, Xiongan New Area Energy Development Group

Is Your Pipeline Integrity at Risk?

This Xiongan case study is a testament to how advanced pipeline hot tapping & stoppling services can solve critical infrastructure challenges without disruption. Whether you are planning a scheduled modification or facing an emergency pipeline repair, partnering with an experienced contractor is paramount.

Are you evaluating solutions for an upcoming pipeline project? Contact our team of experts today for a confidential consultation. Let us show you how our pipeline maintenance services can safeguard your operations, your assets, and your bottom line.