Projects

Pipeline Relocation and River Crossing Project at Luning Line (Zaozhuang Section) – Existing Pipeline Disposal

LuningLine_Zaozhuang_PipelineRelocation_RiverCrossing_Disposal

Project Overview

This crude oil pipeline relocation project is located in Weishan County, Jining City, Shandong Province, addressing safety hazards along the Luning Pipeline.

Key Construction Details:

  • Start Point: Northwest of Xiyuezhuang Village, Hanzhuang Town (CSZ367#+500m)
  • Route: New pipeline parallels the existing line eastward, crossing:
    • Liuqiao Canal
    • Y164 Hancao Road
    • Three major rivers: Lianyunhe, Zhongyunhe, and Yijiahe
  • End Point: Connects to the existing pipeline near CSZ373#
  • Total New Pipeline Length: 5,523.6m
  • Old Pipeline Disposal: 5.8km
LuningLine_Zaozhuang_PipelineRelocation_RiverCrossing_Disposal
LuningLine_Zaozhuang_PipelineRelocation_RiverCrossing_Disposal

Pipeline Specifications:

ParameterValue
Diameterφ720×8.7mm (D711mm)
MaterialL360 steel
Design Pressure6.0 MPa
Operating Pressure2.5 MPa
ContentCrude oil
Corrosion ProtectionAsphalt coating + 3G tape

Construction Schedule & Location:

  • Duration: May 5–19, 2023
  • Location: Zaozhuang City, Shandong Province
  • Client: PipeChina Shandong Operations Center (Jining Operating Area)
LuningLine_Zaozhuang_PipelineRelocation_RiverCrossing_Disposal
LuningLine_Zaozhuang_PipelineRelocation_RiverCrossing_Disposal
LuningLine_Zaozhuang_PipelineRelocation_RiverCrossing_Disposal
LuningLine_Zaozhuang_PipelineRelocation_RiverCrossing_Disposal
LuningLine_Zaozhuang_PipelineRelocation_RiverCrossing_Disposal
LuningLine_Zaozhuang_PipelineRelocation_RiverCrossing_Disposal