Project Overview

This pipeline safety remediation project involves 1.04km of new pipeline construction along the Ningbo-Yongning Crude Oil Pipeline (Pile 181#+350m to 181#+880m) to eliminate encroachment risks and ensure long-term operational safety.

Key Construction Details:

  • Location: Jiaxing Nanhu District (Flat terrain, predominantly plains)
  • Purpose: Remove occupation hazards through pipeline rerouting
  • Method: Hot tapping and block & bleed isolation for tie-in connections
NingboYongning_Pile181_HotTapping_Repair_TieIn
NingboYongning_Pile181_HotTapping_Repair_TieIn
NingboYongning_Pile181_HotTapping_Repair_TieIn
NingboYongning_Pile181_HotTapping_Repair_TieIn

Pipeline Specifications:

ParameterValue
DiameterФ762×10.3mm (D762mm)
MaterialL415 steel
Design Pressure8.5 MPa
Operating Pressure1.0 MPa
ContentCrude oil
Corrosion Protection3PE coating

Construction Schedule & Client:

  • Duration: June 19–27, 2023
  • Client: PipeChina Eastern Crude Oil Storage & Transportation Co., Ltd. (Ningbo Oil Transport Division)