Professional, wide-angle photo of a safe industrial worksite. A crew in full PPE (helmets, fire-resistant suits) is gathered around a pipeline where a yellow hot tap machine is installed. The scene is well-lit, with safety banners in the background. Photorealistic, high detail.

Step-by-Step Guide to a Safe Pipeline Hot Tap Operation

The safe, step-by-step process for a pipeline hot tap operation involves a meticulously planned sequence of preparation, equipment installation, execution, and restoration phases, governed by strict technical standards and safety protocols to add a branch connection to a live, pressurized pipeline without interruption of service. This guide details the complete operational procedure, from initial feasibility

Step-by-Step Guide to a Safe Pipeline Hot Tap Operation Read More »

Execução no local do procedimento de isolamento de um gasoduto de gás natural de alta pressão (perfuração a quente e interrupção do fluxo para o deslocamento de uma linha férrea).

Perfuração em serviço e bloqueio de condutas no gasoduto de alta pressão da CNOOC, no âmbito da construção da linha ferroviária Fuzhou-Xiamen

Project Snapshot Element Details Client China Railway 16th Bureau Group Co., Ltd. Location Fuzhou City, Fujian Province, China Core Challenge Relocating a live, high-pressure (2.0 MPa) natural gas pipeline for a new high-speed rail line without interruption, involving multiple high-risk simultaneous operations. JSW Solution Custom-designed four-point line stop and bypass system, augmented with pneumatic plugging

Perfuração em serviço e bloqueio de condutas no gasoduto de alta pressão da CNOOC, no âmbito da construção da linha ferroviária Fuzhou-Xiamen Read More »

Sucesso na intervenção em serviço e no bloqueio: reparação em tempo real do gasoduto de metano de jazida de carvão Zhonglianmei Shenmu-Anping Φ813

Project Snapshot Item Details Client Huasheng Huifeng Gas Transmission & Distribution Co., Ltd. Location Kelan County, Xinzhou, Shanxi Province, China Pipeline Zhonglianmei Shenmu-Anping Coalbed Methane Pipeline Key Challenge Repairing critical external deformations (up to 13% OD) on a high-pressure, large-diameter transmission pipeline without interrupting the gas supply. JSW Solution A tailored Hot Tapping and Stoppling (Pressure Isolation) plan

Sucesso na intervenção em serviço e no bloqueio: reparação em tempo real do gasoduto de metano de jazida de carvão Zhonglianmei Shenmu-Anping Φ813 Read More »

Colocação em funcionamento de equipamento de perfuração e tamponamento a quente num gasoduto de gás natural de alta pressão de DN400 durante o seu deslocamento (Fuzhou, 2023)

Relocalização de um gasoduto crítico de DN400 para a ampliação da Autoestrada de Fuquan sem interrupção do serviço

Project Spotlight:  Details Client Fujian Natural Gas Co., Ltd. (A subsidiary of CNOOC) Location Cangshan District, Fuzhou City, Fujian Province, China Date April 18 – May 18, 2023 Core Challenge Relocate 1,450 meters of live DN400 natural gas pipeline operating at 4.0 MPa that was obstructed by highway expansion construction, with zero interruption to downstream

Relocalização de um gasoduto crítico de DN400 para a ampliação da Autoestrada de Fuquan sem interrupção do serviço Read More »

Equipamento de perfuração a quente instalado num gasoduto de gás natural em funcionamento (acessórios amarelos), com um trabalhador a supervisionar a operação a partir de uma vala de escavação para serviços de perfuração a quente

Ligação e obstrução em tempo real num gasoduto de 3,0 MPa: um estudo de caso para o projeto de interligação do gasoduto sino-russo

Project Spotlight: Category Details Client State Reserve Pipeline (Shandong) Investment Group Co., Ltd. Location Linyi City, Shandong Province, China Date May 22-23, 2024 Core Challenge Execute a safe, reliable hot tapping pipeline tie-in on a live natural gas pipeline operating at 3.0 MPa, with zero shutdown mandated due to critical downstream demand. JSW Solution Advanced hot tapping and plugging services performed by our

Ligação e obstrução em tempo real num gasoduto de 3,0 MPa: um estudo de caso para o projeto de interligação do gasoduto sino-russo Read More »

Conduta (com cotovelo) ligada a equipamento de perfuração sob pressão, com andaimes e grua preparados para a perfuração sob pressão num projeto EPC

Relatório completo sobre a perfuração em serviço sob alta pressão e alta temperatura para o projeto EPC do Terminal de GNL de Ningbo 

Project Snapshot: Category Details Client International Energy Major (EPC Project) Location Ningbo, China Core Challenge Execute 12 hot taps on live, high-pressure (7.0 MPa) natural gas and high-temperature (300°C) thermal oil pipelines made of high-grade steel (X60/L415Q) with thick, non-standard walls, without shutdown. JSW Solution Custom-engineered hot tapping services, including design/fabrication of heavy-duty fittings, stringent welding procedures, and deployment of proprietary high-capacity drilling equipment. A full-scope EPC support

Relatório completo sobre a perfuração em serviço sob alta pressão e alta temperatura para o projeto EPC do Terminal de GNL de Ningbo  Read More »

Equipamento de perfuração e obstrução de condutas de petróleo bruto para reparação e manutenção da integridade de condutas em funcionamento

Relocalização em serviço e procedimento de «Double Block and Bleed» de um importante oleoduto de petróleo bruto para a Rede Nacional de Oleodutos em Jiaxing

*In June 2023, a high-risk section of the East China Crude Oil Pipeline was successfully replaced without a single minute of shutdown, thanks to precision hot tapping and plugging technology. The 9-day operation eliminated critical encroachment risks, ensuring continuous energy supply and long-term pipeline integrity for the National Pipeline Network.* Facing a critical safety hazard

Relocalização em serviço e procedimento de «Double Block and Bleed» de um importante oleoduto de petróleo bruto para a Rede Nacional de Oleodutos em Jiaxing Read More »

Obra com equipamento de tamponamento e oleoduto, no âmbito do projeto de gestão de riscos de oleodutos, que inclui a eliminação de oleodutos abandonados

Reencaminhamento da Linha Luning e eliminação do oleoduto abandonado para a PipeChina

Project Snapshot Element Details Client PipeChina Shandong Operation & Maintenance Center, Jining Operation Area Location Weishan County, Zaozhuang City, Shandong Province, China Core Challenge Execute a high-risk pipeline hazard management project on an operational D711mm crude oil pipeline. This involved the safe abandoned pipeline disposal of 5.8km of old pipeline and the construction of 5.5km of new line, including

Reencaminhamento da Linha Luning e eliminação do oleoduto abandonado para a PipeChina Read More »

Workers operating equipment in enclosed excavation pit during petroleum pipeline repair, part of pipeline shutdown operation and hot tapping and plugging process

Safe Replacement of an Encroached DN400 Petroleum Pipeline in Hunan Using Advanced Hot Tapping and Plugging Services

Project Overview Aspect Details Client A Major Pipeline Operator in China Location Yueyang County, Hunan Province, China Core Challenge A critical high pressure pipeline segment was in dangerously close proximity to residential buildings, posing a significant public safety risk. Traditional repair methods would require a prolonged, costly full-line shutdown. Our Solution A planned shutdown operation utilizing double block and bleed

Safe Replacement of an Encroached DN400 Petroleum Pipeline in Hunan Using Advanced Hot Tapping and Plugging Services Read More »

Pipeline Encroachment Remediation: Equipment setup for pipeline replacement at Xianggan Wuxin pipeline project site

High-Stakes Pipeline Encroachment Remediation – The Huxi Ancestral Hall Pipeline Relocation Project

Project Snapshot Element Details Client Wuxin Pipeline Operating Company Location Xiaonan District, Xiaogan City, Hubei Province, China Core Challenge A high-pressure natural gas pipeline was severely encroached by the Huxi Ancestral Hall, with a clearance of only 2 meters—a major safety violation and operational risk. Our Solution A “Zero-Shutdown” pipeline replacement using 323mm Double-Sided Stopple &