Thực hiện khoan và bịt lỗ trực tiếp trên đường ống dẫn khí áp suất 3,0 MPa: Nghiên cứu điển hình về Dự án kết nối đường ống Sinorussian

Thiết bị khoan nóng được lắp đặt trên đường ống dẫn khí tự nhiên đang hoạt động (các phụ kiện màu vàng), với công nhân đang theo dõi từ hố đào để thực hiện dịch vụ khoan nóng

Project Spotlight:

CategoryDetails
ClientState Reserve Pipeline (Shandong) Investment Group Co., Ltd.
LocationLinyi City, Shandong Province, China
DateMay 22-23, 2024
Core ChallengeExecute a safe, reliable hot tapping pipeline tie-in on a live natural gas pipeline operating at 3.0 MPa, with zero shutdown mandated due to critical downstream demand.
JSW SolutionAdvanced hot tapping and plugging services performed by our expert contractor team using proprietary, high-pressure-rated equipment, ensuring a secure live pipeline connection.
Key ResultSuccessful DN500 pipeline hot tapping and interconnection completed within 48 hours under full pressure (3.0 MPa), with zero safety incidents and 100% continuous supply maintained.

The Challenge: Connecting Critical Infrastructure Without a Minute of Downtime

In the heart of Shandong’s energy network, our client, State Reserve Pipeline (Shandong) Investment Group, faced a pressing infrastructure upgrade. To enhance market supply capacity, a new Ø508mm pipeline needed to be connected to the existing operational Sinorussian East Route pipeline at the Linyi off-take station.

The dilemma was stark:

  • The Pipeline: A critical artery transporting natural gas.
  • The Mandate: A live pipeline connection was non-negotiable. The downstream demand was too high to permit any shutdown. Even a brief stoppage would translate to significant economic and societal impact.
  • The Technical Hurdle: Performing a DN500 hot tapping and plugging operation on a live natural gas pipeline operating at a substantial 3.0 MPa (435 psi). This is a high-risk procedure demanding extreme precision, flawless equipment, and unparalleled expertise.
  • The Client’s Silent Questions: “Is this pipeline services company experienced enough for such a high-stakes job?” “Can their hot tapping services guarantee absolute safety and success?” “Do they have the right equipment and contractor team for a project of this scale and pressure rating?”
Red hot tapping equipment connected to in-service natural gas pipeline (with yellow fittings) in excavation pit, for live pipeline connection project
Yellow pipeline fittings (including valves) for natural gas pipeline hot tapping, installed on in-service pipeline in excavation pit

The JSW Solution: Integrated Expertise as Both Manufacturer and Service Contractor

JSW Pipeline Services was entrusted with this mission because we offer a unique, integrated value proposition: we are not just a service contractor; we are also the manufacturer of the specialized equipment used in these critical operations. This allows for complete control over quality, safety, and performance.

Our engineered solution centered on a double-block-and-bleed hot tapping and plugging procedure. Here’s how we translated our technical capabilities into tangible client benefits:

  • Function: Custom-designed hot tapping and plugging machines for DN500, rated for 10MPa.
  • Advantage & Benefit: Our in-house manufacturing ensures equipment is perfectly matched to the task, eliminating compatibility issues and providing a fail-safe system. This translates to reduced risk and unwavering confidence for the client during the operation.
  • Function: Proprietary sealing technology and rigorous procedure following ASME PCC-2 & API standards.
  • Advantage & Benefit: Mitigates the extreme risks associated with high-pressure natural gas pipeline hot tapping. The client gains peace of mind knowing the procedure is backed by international best practices, protecting their asset, personnel, and the environment.
  • Function: 24/7 project management and real-time engineering support from our senior team.
  • Advantage & Benefit: The pipeline hot tapping services are overseen by the experts who build the tools. This seamless integration means faster on-site decision-making and problem-solving, ensuring the live pipeline connection project stayed on schedule without compromising safety.

Implementation: Precision Under Pressure

Our execution was a testament to meticulous planning and technical prowess. The key steps included:

  1. Site Safety & Preparation: Establishing exclusion zones, conducting Job Safety Analysis (JSA), and securing the worksite.
  2. Equipment Installation: Mounting the pre-tested hot tapping pipeline assembly (including the temporary valve and hot tap machine) onto the existing D355.6×6.3 pipe.
  3. The Critical Tap: Executing the hot tapping operation to create a branch connection on the live, pressurized pipeline—a process we monitored with extreme precision.
  4. Plugging & Isolation: Installing the pipeline plugging head through the newly created tap to safely isolate the section for the final tie-in.
  5. Tie-in & Completion: Welding the new pipeline segment, followed by the safe retraction of the plugging head and installation of the permanent fitting.

Throughout the two-day project window, our team’s coordination was flawless. We maintained constant communication with the client’s control center, ensuring operational parameters were stable.

Workers installing fittings for natural gas pipeline hot tapping on in-service pipeline, in excavation pit with construction gear
Workers adjusting red hot tapping equipment connected to in-service natural gas pipeline, during live pipeline connection and hot tapping project

Results & Measurable Benefits: Delivering Beyond Expectations

The project was an unqualified success, delivering quantifiable value that directly addressed the client’s core business needs:

  • 100% Uptime Maintained: The natural gas pipeline hot tapping operation was completed without a single minute of supply interruption to downstream users. This was the primary success metric.
  • Flawless Safety Record: Zero accidents, zero leaks, zero environmental incidents. Safety is not just a promise; it’s a measurable outcome.
  • On-Time, On-Budget Delivery: The complex interconnection was completed within the planned 48-hour schedule, demonstrating exceptional project management by our contractor team.
  • Long-Term Infrastructure Integrity: The connection was executed to the highest engineering standards, ensuring the long-term reliability and safety of this expanded network node.

A Word from Our Client:
*“The pressure was immense — both figuratively and literally at 3.0 MPa. We needed a partner who understood the technical complexities of a live pipeline connection on a major artery like the Sinorussian line. JSW’s dual-role as equipment maker and field contractor gave us a distinct advantage. Their team was in complete control, from engineering to execution. They turned a high-anxiety project into a textbook success.”* — Project Manager, State Reserve Pipeline (Shandong).

Why Choose JSW Pipeline Services?

This Linyi project exemplifies the JSW difference. We are a full-spectrum pipeline services company specializing in:

  • Hot Tapping & Plugging Services (DN50 – DN1200)
  • Pipeline Emergency Response & Repair
  • Pipeline Relocation, Installation, and Maintenance
  • Technical Consulting & Engineering Support

As a manufacturer-integrated contractor, we provide a true turnkey solution: expertise you can trust, backed by equipment we build. Whether your pipeline hot tapping challenge is in Shandong or anywhere else in the world, we deliver safety, reliability, and operational continuity.

Facing a critical pipeline interconnection or repair challenge? Contact JSW Pipeline Services today for a confidential consultation with our engineering team.

Yêu cầu tư vấn miễn phí về dịch vụ đường ống

Sẵn sàng hợp tác chưa? Hãy cùng chúng tôi thực hiện một dự án!

Tìm hiểu thêm tại

Bạn đang gặp khó khăn trong việc triển khai dự án đường ống? Hãy nhận giải pháp được thiết kế riêng từ các chuyên gia của chúng tôi. Vui lòng cung cấp thông tin chi tiết của bạn ở bên dưới, và chúng tôi sẽ liên hệ với bạn trong vòng 24 giờ để thảo luận về các yêu cầu dự án, tiến độ và ngân sách của bạn.

Bắc Kinh Jinshiwan là nhà cung cấp tổng hợp hàng đầu về công nghệ và dịch vụ đường ống, kết hợp sản xuất thiết bị cao cấp với chuyên môn kỹ thuật chuyên nghiệp. Chúng tôi cung cấp các giải pháp đường ống an toàn, đáng tin cậy và sáng tạo trong suốt vòng đời cho các ngành công nghiệp dầu khí, hóa chất và tiện ích trên toàn cầu.

Xây dựng và lắp đặt đường ống
  • Xây dựng đường ống xuyên quốc gia
  • Lắp đặt và vận hành thử đường ống
  • Lắp đặt hệ thống đường ống nhà máy
  • Di dời và cải tạo đường ống
  • Dịch vụ khoan lấy mẫu nóng và khoan lấy mẫu dưới áp lực
  • Dịch vụ bịt kín và cách ly đường ống
  • Sửa chữa khẩn cấp đường ống
  • Cải tạo và lót ống dẫn
  • Sửa chữa bằng ống lót composite (lắp đặt ống lót loại B)
  • Bảo vệ chống ăn mòn và sửa chữa
  • Quản lý tính toàn vẹn của đường ống
  • Dịch vụ hỗ trợ kiểm tra trực tuyến
  • Các công việc sửa chữa đường dây điện đang hoạt động mà không gây gián đoạn
  • Thử áp lực đường ống
  • Vệ sinh và sấy khô đường ống
  • Sản xuất máy khoan nóng
  • Sản xuất thiết bị bịt ống dẫn
  • Sản xuất phụ kiện đường ống theo yêu cầu
  • Sản xuất van đặc biệt

• Khả năng ứng phó khẩn cấp 24/7
• Các tiêu chuẩn tuân thủ API và ASME
• Quản lý dự án đa ngôn ngữ
• Hỗ trợ vận chuyển và hậu cần toàn cầu
• Giám sát kỹ thuật tại hiện trường trên toàn thế giới

Các dự án dịch vụ đường ống của JSW

Dịch vụ đường ống

Niềm tin và Giá trị

Khách hàng của chúng tôi