نظرة عامة على المشروع
In September 2021, inline inspection (ILI) of the Xingxian Gas (CBM) Utilization Project and Yuanping Second Gas Source Connection Project revealed critical deformations requiring pipe replacement:
- 13% OD deformation at 12,189.156m
- 11.8% OD deformation at 46,632.817m
- 11.3% OD deformation at 13,012.803m
This non-stop pipeline isolation solution ensures continuous CBM supply during repairs.




Key Technical Details:
| المعلمة | القيمة |
|---|---|
| القطر | Ф813×12.5mm |
| المواد | L450 steel |
| ضغط التصميم | 8.0 MPa |
| ضغط التشغيل | 4.0 MPa |
| المحتوى | الغاز الطبيعي |
| الطلاء | 3PE anti-corrosion |
الجدول الزمني للمشروع وأصحاب المصلحة:
- العميل: Huasheng Huifeng Gas Transmission Co., Ltd.
- المدة: April 24 – July 15, 2022
- الموقع: Kelan County, Xinzhou City, Shanxi Province