
Inversion vs. Pull-in-Place vs. UV: Choosing the CIPP Installation Method
Choose the route by host conditions and cure control, not by habit. The everted route suits long, tight-bore runs; the pulled route, runs needing tighter on-site thickness control; the light route, fast, low-emission schedules. All three share a typical 150-300 m single-run band, so diameter and access decide first. Choosing














