Live Tapping for Hunan Zhongyou Gas High-Pressure Natural Gas Pipeline Relocation

Specialized hot tapping equipment operating on live 2.2MPa natural gas pipeline, enabling zero-interruption relocation technology.

Project Overview: High-Pressure Pipeline Relocation with Zero Supply Interruption

Aspect Details
Client Hunan Zhongyou Gas Co., Ltd.
Location Liling City, Hunan Province, China
Project Name Xiangli Branch Line (Yuci Road to Gas Company Section) High-Pressure Gas Pipeline Relocation
Core Challenge Relocating a critical 6.3MPa gas supply line without interrupting the 2.2MPa operational flow to downstream users, amidst complex urban terrain.
Key Solution Advanced hot tapping and plugging techniques to create a new pipeline section tie-in, eliminating the need for a costly and disruptive full system shutdown.
Key Results 100% success with zero safety incidents, zero gas supply interruption, and project completion within a strict 5-day timeline.

The Challenge: Relocating a Critical Artery Without Stopping the Heart

For natural gas pipeline construction companies, the most demanding projects are those where the pipeline cannot be shut down. Our client, Hunan Zhongyou Gas, faced precisely this dilemma.

The existing high-pressure natural gas pipeline, operating at 2.2MPa, was in the path of new urban development in Liling City. Relocating this section was essential, but a traditional shutdown for a cut-and-weld operation was not an option. The financial and reputational cost of interrupting gas supply to residential and commercial users would be immense.

The technical specifications added layers of complexity:

  • High Design Pressure: The pipeline is classified as a GA1-class pressure pipeline, the highest risk category, with a design pressure of 6.3MPa.

  • Live Operation: All work had to be performed on the high pressure gas pipeline while it remained in service.

  • Complex Urban Setting: The new route wove through green belts, sidewalks, and under roads, requiring precision and minimal surface disruption.

  • Aggressive Timeline: The client required the entire relocation, including the abandonment of the old section, to be completed within a 5-day window.

This project was a test of true expertise, where failure was not an option.

Excavation of a deep, precise trench for the new GA1 class L360M steel pipeline, with workers conducting alignment checks.

The Solution: A Precision Engineered Live Tapping and Plugging Plan

As a specialist in live pipeline modification, Beijing Jinshiwan Pipeline Technology designed a bespoke solution centered on hot tapping services and pipeline plugging services. Our approach ensured a seamless transition from the old line to the new one with zero downtime.

Our pipeline relocation services included:

  1. Precision Planning & Tie-In Design: Before a single piece of equipment was mobilized, our engineers developed a meticulous procedure. This included designing the exact points for the two hot taps and four non-fire cuts, ensuring the new 551-meter section of L360M pipe would integrate perfectly.

  2. Advanced Hot Tapping & Plugging: The core of the operation. We performed two separate hot tapping procedures on the live, pressurized DN350 pipeline. This allowed us to install temporary plugging devices, isolating the section to be decommissioned and directing the gas flow through the newly laid parallel pipeline. This is the hallmark of a top-tier pipeline construction company, enabling work on active lines without pressure reduction or flow stoppage.

  3. Safe Decommissioning of the Old Line: Once the flow was diverted, the abandoned section was made safe through a nitrogen purge and grouting procedure, a critical step in the pipeline abandonment process that prevents future corrosion and ensures long-term integrity.

live tapping hot tapping operating gas pipeline
Installation and anti-corrosion treatment of pipeline components, showcasing the application of reinforced 3PE coating.

The Implementation: Flawless Execution Under Pressure

Our reputation as a reliable pipeline contractor in China is built on our ability to execute complex plans with military precision. The 5-day timeline was a testament to our project management and technical skill.

  • Day 1-2: Preparation & Excavation. Site setup, excavation of operational pits for the hot tapping machines, and final alignment checks of the new pipeline.

  • Day 3: Critical Tapping Operations. The two hot taps were successfully executed on the live mainline. This phase required the highest level of safety protocols and expert machine operation.

  • Day 4: Flow Diversion & Tie-In. The plugging heads were set, diverting the gas flow to the new pipeline. The old section was then isolated, and the final connections were made.

  • Day 5: Testing, Reinstatement, & Commissioning. The new section underwent rigorous pressure testing and purging before being brought fully online. The operation pits were backfilled, and the site was restored to its original condition.

Throughout the process, our expertise in L360M pipe welding and 3PE anti-corrosion coating ensured the new pipeline section met all GA1 class pipeline construction standards for safety and longevity.

Results & Benefits: Quantifiable Success for the Client

The successful completion of this project delivered immediate and long-term value, solidifying the trust clients place in expert natural gas pipeline construction companies.

  • Zero Supply Interruption: Gas continued to flow to all end-users at the required 2.2MPa pressure throughout the entire project. The client avoided significant revenue loss and customer dissatisfaction.

  • 100% Safety Record: The project was completed with zero accidents or safety incidents, a non-negotiable standard for high-risk high pressure gas pipeline work.

  • On-Time Delivery: All work was completed within the aggressive 5-day contractual deadline, minimizing community impact and project overhead.

  • Long-Term Infrastructure Integrity: The new pipeline section, built to the highest standards, ensures reliable energy supply for the region’s future growth.

Certified welder performing a critical weld on the 6.3MPa high-pressure natural gas pipeline, ensuring long-term integrity and safety.
Installation of pipeline components with non-destructive testing for high-pressure natural gas pipeline system integrity verification.

Client Testimonial:

“The Beijing JSW team demonstrated why they are considered leaders among natural gas pipeline construction companies. Their ability to execute a complex live pipeline modification under such a tight deadline and without any disruption to our service was impressive. Their hot tapping services were flawlessly managed, and their communication was clear throughout. They turned a high-risk challenge into a seamless operation.”

— Project Manager, Hunan Zhongyou Gas Co., Ltd.

Yêu cầu tư vấn miễn phí về dịch vụ đường ống

Sẵn sàng hợp tác chưa? Hãy cùng chúng tôi thực hiện một dự án!

Tìm hiểu thêm tại

Bạn đang gặp khó khăn trong việc triển khai dự án đường ống? Hãy nhận giải pháp được thiết kế riêng từ các chuyên gia của chúng tôi. Vui lòng cung cấp thông tin chi tiết của bạn ở bên dưới, và chúng tôi sẽ liên hệ với bạn trong vòng 24 giờ để thảo luận về các yêu cầu dự án, tiến độ và ngân sách của bạn.

Bắc Kinh Jinshiwan là nhà cung cấp tổng hợp hàng đầu về công nghệ và dịch vụ đường ống, kết hợp sản xuất thiết bị cao cấp với chuyên môn kỹ thuật chuyên nghiệp. Chúng tôi cung cấp các giải pháp đường ống an toàn, đáng tin cậy và sáng tạo trong suốt vòng đời cho các ngành công nghiệp dầu khí, hóa chất và tiện ích trên toàn cầu.

Xây dựng và lắp đặt đường ống
  • Xây dựng đường ống xuyên quốc gia
  • Lắp đặt và vận hành thử đường ống
  • Lắp đặt hệ thống đường ống nhà máy
  • Di dời và cải tạo đường ống
  • Dịch vụ khoan lấy mẫu nóng và khoan lấy mẫu dưới áp lực
  • Dịch vụ bịt kín và cách ly đường ống
  • Sửa chữa khẩn cấp đường ống
  • Cải tạo và lót ống dẫn
  • Sửa chữa bằng ống lót composite (lắp đặt ống lót loại B)
  • Bảo vệ chống ăn mòn và sửa chữa
  • Quản lý tính toàn vẹn của đường ống
  • Dịch vụ hỗ trợ kiểm tra trực tuyến
  • Các công việc sửa chữa đường dây điện đang hoạt động mà không gây gián đoạn
  • Thử áp lực đường ống
  • Vệ sinh và sấy khô đường ống
  • Sản xuất máy khoan nóng
  • Sản xuất thiết bị bịt ống dẫn
  • Sản xuất phụ kiện đường ống theo yêu cầu
  • Sản xuất van đặc biệt

• Khả năng ứng phó khẩn cấp 24/7
• Các tiêu chuẩn tuân thủ API và ASME
• Quản lý dự án đa ngôn ngữ
• Hỗ trợ vận chuyển và hậu cần toàn cầu
• Giám sát kỹ thuật tại hiện trường trên toàn thế giới

Các dự án dịch vụ đường ống của JSW

Dịch vụ đường ống

Niềm tin và Giá trị

Khách hàng của chúng tôi