نظرة عامة على المشروع
This gas pipeline relocation is necessitated by the highway expansion of the Fuquan Expressway connector and planned Luocheng Road routing in Cangshan District, Fuzhou City. Approximately 1,450m of existing pipeline is encroached by planned ramps and roundabouts, with some sections directly beneath highway interchange pile foundations. The new route spans 1,821.7m (Pile AP-01 to AP-52).
تفاصيل البناء الرئيسية:
- Reason: Ensure highway construction safety and pipeline operational integrity
- Encroachment Type:
- Highway ramps
- Roundabout construction
- Pile foundations




مواصفات خط الأنابيب:
| المعلمة | القيمة |
|---|---|
| القطر | Ф406×7.9mm |
| المواد | فولاذ L415 |
| ضغط التصميم | 7.5 MPa |
| ضغط التشغيل | 4.0 MPa |
| المحتوى | الغاز الطبيعي |
| الطلاء | 3PE anti-corrosion |
الجدول الزمني للمشروع وأصحاب المصلحة:
- العميل: CNOOC Fujian Natural Gas Co., Ltd.
- المدة: April 18 – May 18, 2023
- الموقع: Qingliang Village, Chengmen Town, Cangshan District