Taraudage en direct pour le déplacement du gazoduc de gaz naturel à haute pression de Hunan Zhongyou Gas

Équipement spécialisé de prise à chaud fonctionnant sur un gazoduc de 2,2 MPa, permettant une technologie de relocalisation sans interruption.

Project Overview: High-Pressure Pipeline Relocation with Zero Supply Interruption

Aspect Détails
Client Hunan Zhongyou Gas Co., Ltd.
Localisation Liling City, Hunan Province, China
Nom du projet Xiangli Branch Line (Yuci Road to Gas Company Section) High-Pressure Gas Pipeline Relocation
Défi central Relocating a critical 6.3MPa gas supply line without interrupting the 2.2MPa operational flow to downstream users, amidst complex urban terrain.
Key Solution Advanced hot tapping and plugging techniques to create a new pipeline section tie-in, eliminating the need for a costly and disruptive full system shutdown.
Principaux résultats 100% success with zero safety incidents, zero gas supply interruption, and project completion within a strict 5-day timeline.

The Challenge: Relocating a Critical Artery Without Stopping the Heart

For natural gas pipeline construction companies, the most demanding projects are those where the pipeline cannot be shut down. Our client, Hunan Zhongyou Gas, faced precisely this dilemma.

The existing high-pressure natural gas pipeline, operating at 2.2MPa, was in the path of new urban development in Liling City. Relocating this section was essential, but a traditional shutdown for a cut-and-weld operation was not an option. The financial and reputational cost of interrupting gas supply to residential and commercial users would be immense.

The technical specifications added layers of complexity:

  • High Design Pressure: The pipeline is classified as a GA1-class pressure pipeline, the highest risk category, with a design pressure of 6.3MPa.

  • Live Operation: All work had to be performed on the high pressure gas pipeline while it remained in service.

  • Complex Urban Setting: The new route wove through green belts, sidewalks, and under roads, requiring precision and minimal surface disruption.

  • Aggressive Timeline: The client required the entire relocation, including the abandonment of the old section, to be completed within a 5-day window.

This project was a test of true expertise, where failure was not an option.

Excavation of a deep, precise trench for the new GA1 class L360M steel pipeline, with workers conducting alignment checks.

The Solution: A Precision Engineered Live Tapping and Plugging Plan

As a specialist in live pipeline modification, Beijing Jinshiwan Pipeline Technology designed a bespoke solution centered on hot tapping services and pipeline plugging services. Our approach ensured a seamless transition from the old line to the new one with zero downtime.

Our pipeline relocation services included:

  1. Precision Planning & Tie-In Design: Before a single piece of equipment was mobilized, our engineers developed a meticulous procedure. This included designing the exact points for the two hot taps and four non-fire cuts, ensuring the new 551-meter section of L360M pipe would integrate perfectly.

  2. Advanced Hot Tapping & Plugging: The core of the operation. We performed two separate hot tapping procedures on the live, pressurized DN350 pipeline. This allowed us to install temporary plugging devices, isolating the section to be decommissioned and directing the gas flow through the newly laid parallel pipeline. This is the hallmark of a top-tier pipeline construction company, enabling work on active lines without pressure reduction or flow stoppage.

  3. Safe Decommissioning of the Old Line: Once the flow was diverted, the abandoned section was made safe through a nitrogen purge and grouting procedure, a critical step in the pipeline abandonment process that prevents future corrosion and ensures long-term integrity.

live tapping hot tapping operating gas pipeline
Installation and anti-corrosion treatment of pipeline components, showcasing the application of reinforced 3PE coating.

The Implementation: Flawless Execution Under Pressure

Our reputation as a reliable pipeline contractor in China is built on our ability to execute complex plans with military precision. The 5-day timeline was a testament to our project management and technical skill.

  • Day 1-2: Preparation & Excavation. Site setup, excavation of operational pits for the taraudage à chaud machines, and final alignment checks of the new pipeline.

  • Day 3: Critical Tapping Operations. The two hot taps were successfully executed on the live mainline. This phase required the highest level of safety protocols and expert machine operation.

  • Day 4: Flow Diversion & Tie-In. The plugging heads were set, diverting the gas flow to the new pipeline. The old section was then isolated, and the final connections were made.

  • Day 5: Testing, Reinstatement, & Commissioning. The new section underwent rigorous pressure testing and purging before being brought fully online. The operation pits were backfilled, and the site was restored to its original condition.

Throughout the process, our expertise in L360M pipe welding and 3PE anti-corrosion coating ensured the new pipeline section met all GA1 class pipeline construction standards for safety and longevity.

Results & Benefits: Quantifiable Success for the Client

The successful completion of this project delivered immediate and long-term value, solidifying the trust clients place in expert natural gas pipeline construction companies.

  • Zero Supply Interruption: Gas continued to flow to all end-users at the required 2.2MPa pressure throughout the entire project. The client avoided significant revenue loss and customer dissatisfaction.

  • 100% Dossier de sécurité : The project was completed with zero accidents or safety incidents, a non-negotiable standard for high-risk high pressure gas pipeline work.

  • Respect des délais : All work was completed within the aggressive 5-day contractual deadline, minimizing community impact and project overhead.

  • Intégrité des infrastructures à long terme : The new pipeline section, built to the highest standards, ensures reliable energy supply for the region’s future growth.

Certified welder performing a critical weld on the 6.3MPa high-pressure natural gas pipeline, ensuring long-term integrity and safety.
Installation of pipeline components with non-destructive testing for high-pressure natural gas pipeline system integrity verification.

Témoignage d'un client :

“The Beijing JSW team demonstrated why they are considered leaders among natural gas pipeline construction companies. Their ability to execute a complex live pipeline modification under such a tight deadline and without any disruption to our service was impressive. Their hot tapping services were flawlessly managed, and their communication was clear throughout. They turned a high-risk challenge into a seamless operation.”

— Project Manager, Hunan Zhongyou Gas Co., Ltd.

Demander une consultation gratuite sur le service des pipelines

Prêt à travailler ensemble ? Construisez un projet avec nous !

En savoir plus

Vous êtes confronté à un problème de pipeline ? Obtenez une solution sur mesure de la part de nos experts. Indiquez vos coordonnées ci-dessous et nous vous contacterons dans les 24 heures pour discuter des exigences, du calendrier et du budget de votre projet.

Beijing Jinshiwan est un fournisseur intégré de premier plan en matière de technologies et de services liés aux pipelines, qui associe la fabrication d'équipements haut de gamme à une expertise professionnelle en matière d'ingénierie. Nous fournissons des solutions sûres, fiables et innovantes pour l'ensemble du cycle de vie des pipelines aux industries mondiales du pétrole et du gaz, de la chimie et des services publics.

Construction et installation de pipelines
  • Construction de pipelines à travers le pays
  • Installation et mise en service des pipelines
  • Installation des systèmes de canalisation de l'usine
  • Déplacement et modification de pipelines
  • Services de taraudage à chaud et de taraudage sous pression
  • Services d'obturation et d'isolation des pipelines
  • Réparation d'urgence des canalisations
  • Réhabilitation et revêtement de pipelines
  • Réparation d'un manchon composite (installation d'un manchon B)
  • Protection contre la corrosion et réparation
  • Gestion de l'intégrité des pipelines
  • Services de soutien à l'inspection en ligne
  • Modifications de la ligne sous tension sans perturbation
  • Essais sous pression des pipelines
  • Nettoyage et séchage des canalisations
  • Fabrication de machines à tarauder à chaud
  • Production d'équipements d'obturation de pipelines
  • Fabrication de raccords de tuyauterie sur mesure
  • Fabrication de vannes spéciales

- Capacité d'intervention d'urgence 24 heures sur 24 et 7 jours sur 7
- Normes API et ASME
- Gestion de projets multilingues
- Expédition et soutien logistique à l'échelle mondiale
- Supervision technique sur place dans le monde entier

JSW Pipeline Service Projects

Service des pipelines

Confiance et valeur

Nos clients