Project Overview
To meet market demand, this interconnection pipeline project requires adding a new DN508 pipeline to the existing Ф508 active gas line. Due to continuous downstream supply requirements, the construction will use hot tapping and plugging technology to avoid shutdowns.
Key Construction Details:
- Scope: DN500 hot tapping and plugging
- Pipeline Specifications:
- Diameter: D355.6×6.3mm
- Content: Natural gas
- Operating Pressure: 3.0 MPa
- Client: China Reserve Pipeline (Shandong) Investment Group Co., Ltd.
- Duration: May 22–23, 2024
- Location: Linyi City, Shandong Province