Projects

Pipeline Replacement and Encroachment Remediation Project

Pipeline_Replacement_Encroachment_Remediation

Project Overview

This project addresses safety hazards caused by pipeline encroachment near residential areas in Mayidian Village, Wuyuan Township, Yueyang County, Hunan Province. The existing pipeline, originally installed via directional drilling under National Highway 107, poses risks due to its proximity to populated areas.

Key Construction Details:

  • Method: Double-sided single isolation (DN406 double block and bleed) with oil drainage and cold cutting
  • Welding Classification: Special-grade hot work permit required
  • Location: 56km+400m mark of Chang-Chun Pipeline
Pipeline_Replacement_Encroachment_Remediation
Pipeline_Replacement_Encroachment_Remediation

Pipeline Specifications:

ParameterNew PipelineExisting Pipeline
DiameterD406.4mmD406.4mm
Wall Thickness9.5mm (PSL2 L415M SAW)7.1mm (L415MB ERW)
Design Pressure10 MPa10 MPa
ProcessSpiral submerged arc weldingHigh-frequency straight seam welding

Safety Measures:

  • Electrostatic discharge using clamp-equipped grounding wires
  • Advanced double-block isolation for zero-leakage assurance
  • Strict sequence control for operational safety

Construction Scope & Schedule

  • Work Scope: DN406 double block and bleed isolation
  • Duration: May 23–27, 2024
Pipeline_Replacement_Encroachment_Remediation
Pipeline_Replacement_Encroachment_Remediation