
Pipeline Equipment
Hot Tapping Cross Fittings Series
JSW Hot Tapping Cross Fittings are premium, full-encirclement split-tee components designed for pipeline contractors and operators to safely create new branch connections or install isolation plugs on live oil, gas, chemical, and municipal pipelines without shutdown, minimizing production loss and operational risk.
Core Advantages:
-
Uninterrupted Operation: Enable hot tapping and line stop procedures under pressure, eliminating costly downtime.
-
Maximum Safety & Pressure Integrity: Manufactured to ASME/API standards for pressure classes 150 through 900 (4.0MPa to 15.0MPa), ensuring reliability in critical service.
-
Superior Flexibility: Acts as a Four-Way Type Stopple Fitting or a standard branch connection. Available in a wide range of materials (e.g., A516 Gr.70) and sizes, customizable per project.
-
Complete System Compatibility: Designed to integrate seamlessly with your existing hot tap and plugging machine and tools, providing a total solution.
Detailed Product Description
How It Works :
-
Weld: The split cross halves are assembled and welded onto the live pipeline.
-
Tap: A hot tap machine is mounted on the fitting’s outlet to drill into the main pipe.
-
Isolate/Connect: For isolation, a line stop fitting or Stopple Fittings are inserted. For branching, the valve is closed, and the tapping machine is removed, leaving a new pressurized branch line.
Technical Specifications Table:
| Parameter | Specification |
|---|---|
| Design Standards | ASME B31.3, B31.4, B31.8, API 6D |
| Pressure Classes | 150, 300, 600, 900 / 4.0MPa, 6.3MPa, 10.0MPa, 15.0MPa |
| Temperature Range | -20°C to +200°C (Standard) |
| Main Materials | Carbon Steel (A516 Gr.70, Q345R), Stainless Steel, Duplex |
| Connection Types | Butt-Weld Ends, Flanged Outlets (RF, RTJ) |
| Size Range (Main Pipe) | From 2″ NB up to 48″ NB (Custom sizes available) |
| Outlet Sizes | Customizable per project requirements |
Core Components:
-
Full-Encirclement Split Tee Body: Provides 360° reinforcement of the main pipe.
-
Integral Outlet Nozzle: Pre-welded flange or welding neck for machine attachment.
-
High-Strength Fasteners: ASTM A193 B7 studs and heavy hex nuts for secure assembly.
-
Premium Seals: Pressure-energized gaskets and sealing ensure leak-proof integrity.
Core Pain Points Solved
Client Pain Points Analysis:
-
“Need to add a connection but cannot afford a pipeline shutdown costing thousands per hour?”
-
“Concerned about the safety risks of welding and working on live, pressurized lines?”
-
“Requiring a fitting that can function as both a hot tap tee and an isolation point for future maintenance?”
-
“Struggling to find a supplier who can deliver custom, certified fittings on schedule?”
Application
-
Scenario 1: New Branch Installation: Adding a new line to an active crude oil transmission pipeline.
-
Scenario 2: Pipeline Isolation (Line Stopping): Isolating a section for valve replacement or repair using Pipeline Isolation Plugs.
-
Scenario 3: Emergency Bypass: Installing a temporary bypass around a damaged pipeline section.
-
Scenario 4: Meter or Instrument Tapping: Creating a safe tap point for monitoring equipment.
Comparative Advantage (Why Choose JSW?)
Vs. Traditional Welded Tees or Shutdowns:
| Method | Downtime | Safety Risk | Flexibility |
|---|---|---|---|
| Full Shutdown & Cut-in | Days/Weeks | Low (cold work) | None |
| Traditional Welded Tee | Possible shutdown required | High (live line welding) | Low |
| JSW Hot Tap Cross | Zero | Controlled & Standardized | High (Multi-use) |
Vs. Other Fittings:
JSW Hot Tapping Cross Fittings offer superior design with a full-encirclement structure for optimal stress distribution, unlike simpler weld-on saddles. As a direct manufacturer, we control quality and price, offering better value than many traders.
Certifications, Safety & Quality Standards
-
Certifications & Compliance: Manufactured under ISO 9001:2015 Quality Management Systems. Materials are fully traceable with MTCs. Designs comply with ASME, API, and PED (CE Marking available).
-
Safety by Design: The split design allows for visual inspection of the pipe before final assembly. All pressure-containing parts are 100% inspected.
-
Testing & Validation: Each fitting is hydrostatically tested to 1.5 times its design pressure. We provide certified test reports.
Customer Testimonials & Success Cases
Case Study: Gas Distribution Network Expansion
-
Client: A European City Gas Company.
-
Challenge: Connect a new residential district to a high-pressure gas main without interrupting supply to 50,000 existing customers.
-
Solution: Used JSW Hot Tapping and Line Stop Fittings (Class 600, 16″ x 8″) to safely create the tie-in.
-
Result: Connection completed in 18 hours with zero supply disruption or safety incidents, saving an estimated €250,000 in potential revenue loss.
Service & Support System
-
Pre-Sales Support: Free technical consultation and design review for your pipeline plugging project.
-
Training: We offer guidance on proper installation procedures for your crew.
-
After-Sales Guarantee:
-
12-month warranty against material and manufacturing defects.
-
Global logistics support for spare parts and components.
-
-
Flexible Business Model: We supply fittings directly to end-users, contractors, and rental companies.
FAQ (Frequently Asked Questions)
Q1: Can your Hot Tapping Cross be used for line stopping as well?
A: Absolutely. Our Cross-Type Hot Tap Fitting is specifically designed for dual purpose. It serves as a robust Full-Encirclement Split Tee for branch connections and is engineered to accommodate Mechanical Pipeline Plugging Devices or Stopple Fittings for isolation tasks, making it a versatile pipeline isolation fitting.
Q2: What is the delivery time for custom-sized fittings?
A: As a specialized factory, we pride ourselves on agile production. Standard sizes are typically available from stock. For custom dimensions or materials, lead times range from 6-10 weeks, depending on complexity. Contact us with your specs for an accurate timeline.
Q3: Do you provide installation supervision or services?
A: While we are equipment manufacturers and suppliers, we partner with certified installation contractors worldwide. We can recommend experienced service providers in your region and ensure they have the technical data for a successful installation.
JSW Pipeline Solutions
JSW Pipeline Solutions stands at the forefront of pipeline intervention technology. As a dedicated manufacturer and supplier, we bridge the gap between innovative engineering and the practical demands of the field. We understand that contractors and asset-holding companies need more than just equipment for sale; they need dependable systems and a partner who guarantees performance.
Our core advantage is vertical integration: from design in our advanced R&D center to precision machining in our own factory, we control every step. This allows us to ensure unmatched quality, offer competitive price points, and provide rapid customization—key benefits that distributors or trading companies cannot match. Our Hot Tapping Cross Fittings exemplify this approach: they are not just commodities but engineered solutions built to be the most reliable component in your critical service operation.
Why does this matter for your next project? It means you get a fitting that is guaranteed to mate perfectly with your machine, backed by direct technical support from the people who designed it, and delivered with the traceability and certification that major projects demand. You’re not just buying a product; you’re investing in a seamless workflow and peace of mind.
Have a specific pipeline modification or isolation challenge?
Let our engineers work with you to configure the optimal Hot Tapping Cross solution. Request your personalized consultation and quotation today.
Pipeline Equipment
Pipeline Services
Related products
Request a Free Pipeline Service Consultation
Learn More From
Facing a pipeline challenge? Get a tailored solution from our experts. Provide your details below, and we’ll contact you within 24 hours to discuss your project requirements, timeline, and budget.
Beijing Jinshiwan is a leading integrated provider of pipeline technology and services, combining high-end equipment manufacturing with professional engineering expertise. We deliver safe, reliable, and innovative full-lifecycle pipeline solutions for the global oil & gas, chemical, and utility industries.
Pipeline Construction & Installation
- Cross-country pipeline construction
- Pipeline installation and commissioning
- Plant pipeline systems installation
- Pipeline relocation and modification
Pipeline Maintenance & Repair
- Hot tapping and pressure tapping services
- Pipeline plugging and isolation services
- Emergency pipeline repair
- Pipeline rehabilitation and lining
- Composite sleeve repair (B-sleeve installation)
- Corrosion protection and repair
Specialized Technical Services
- Pipeline integrity management
- In-line inspection support services
- Non-disruptive live line modifications
- Pipeline pressure testing
- Pipeline cleaning and drying
Equipment & Manufacturing
- Hot tapping machine manufacturing
- Pipeline plugging equipment production
- Custom pipeline fittings fabrication
- Special valve manufacturing
Our International Service Advantages:
• 24/7 emergency response capability
• API and ASME compliant standards
• Multilingual project management
• Global shipping and logistics support
• On-site technical supervision worldwide
Trust and Worth
Our Clients




























