Project Snapshot
| Element | Details |
|---|---|
| Client | Wuxin Pipeline Operating Company |
| Location | Xiaonan District, Xiaogan City, Hubei Province, China |
| Core Challenge | A high-pressure natural gas pipeline was severely encroached by the Huxi Ancestral Hall, with a clearance of only 2 meters—a major safety violation and operational risk. |
| Our Solution | A “Zero-Shutdown” pipeline replacement using 323mm Double-Sided Stopple & Plugging Technology to bypass the structure safely. |
| Key Results | • Pipeline clearance increased from 2m to 11m (450% improvement). • 100% continuous gas transmission on the mainline achieved. • Project completed in 7 days with 100% weld inspection pass rate. • Permanent regulatory compliance and long-term integrity assured. |
The Challenge: When Cultural Heritage and Critical Infrastructure Collide
For the operators of the high-pressure Wuxin Pipeline, a routine inspection revealed a ticking time bomb. At a section running through Xiaogan, the pipeline passed a mere 2 meters from the historic Huxi Ancestral Hall. This wasn’t just a minor infringement; it was a severe pipeline encroachment that violated critical national safety codes (like GB 50251) and international standards (ASME B31.8).
The client faced a multifaceted crisis:
-
Immediate Safety & Regulatory Risk: The non-compliant spacing presented a direct public safety threat, risking catastrophic failure and inviting stringent regulatory penalties.
-
Operational Paralysis: The encroachment made essential pipeline integrity management activities—like inspection, maintenance, and emergency response—nearly impossible.
-
The Cost of a Shutdown: A traditional pipeline replacement would require a complete shutdown of this vital energy artery, resulting in massive revenue loss and supply chain disruption for downstream users.
-
Sensitive Execution Environment: Working adjacent to a culturally significant structure demanded a solution that was not only technically sound but also minimally invasive and precise.
This was far more than a simple pipeline replacement project; it was a complex high-pressure pipeline safety emergency requiring a surgical solution.
The Solution: A Precision-Engineered “Surgical Bypass” with Zero Interruption
Our engineering team conducted a meticulous feasibility study, evaluating multiple rerouting options. The optimal path was clear: a new 51.69-meter bypass along the hall’s northeast side. However, the how was the real challenge. We proposed and executed a bespoke natural gas pipeline relocation strategy centered on one core principle: maintain 100% mainline flow.
Our Integrated Technical Approach:
-
Route Optimization & Premium Materials: The new bypass was constructed using L415Q grade seamless steel pipe (SMLS) with a 7.9mm wall thickness, designed to match the original 9.5MPa operating pressure. A combination of precision cold bends and hot bends ensured a smooth, stress-minimized route, achieving a final safe clearance of 11 meters.
-
The Heart of the Solution: Double-Sided Stopple & Plugging (323mm): This advanced pipeline hot tapping and plugging technique was the cornerstone of our pipeline encroachment remediation plan. We installed isolation plugs upstream and downstream of the work section, creating a completely isolated and safe segment for replacement.
-
Client Benefit (Zero Downtime): The main pipeline continued normal operation. We eliminated the client’s biggest fear: production and revenue loss.
-
Safety Benefit (Zero Ignition Risk): The work zone was depressurized and inert, allowing for cutting and welding with absolute safety—a non-negotiable requirement near any structure.
-
-
Uncompromising Quality Assurance: The project utilized automated welding for superior consistency, with every single weld undergoing 100% radiographic (RT) and ultrasonic (UT) testing. All plugging and fitting equipment was from certified, high-reliability manufacturers.
The Execution: Seven Days of Flawless, Coordinated Precision
In July 2024, our specialist team mobilized to the site in Hubei for a tightly scheduled 7-day operation.
-
Phase 1: Prep & Positioning (Days 1-2): Site establishment, final alignment verification, and community liaison. Advanced monitoring systems were installed on the ancestral hall to detect any micro-vibrations or settlement in real-time.
-
Phase 2: The Critical Isolation (Days 3-4): Our certified technicians performed the double-sided plugging procedure. Following safe depressurization, the encroached pipe section was carefully cut and removed. This phase demonstrated our core competency as a specialist pipeline services contractor.
-
Phase 3: Reconstruction (Days 5-6): The new L415Q pipe section was aligned, welded, and inspected. The integrity of every component was verified before proceeding.
-
Phase 4: Integration & Restart (Day 7): The isolation plugs were retrieved, tie-in fittings were secured, and the new section was hydrostatically tested, purged, and seamlessly integrated into the live pipeline system. Full pressure was restored without incident.
Results & Lasting Impact: Transforming Risk into Resilient Safety
The success of this project is measured in hard data and lasting security:
Quantifiable Outcomes:
-
Safety & Compliance Achieved: Permanent resolution of the encroachment hazard, with clearance now at a compliant 11 meters. The client’s regulatory exposure was eliminated.
-
Uninterrupted Operations: Our double-sided stoppeling solution guaranteed zero interruption to gas supply, safeguarding the client’s revenue and reputation.
-
Predictable, Efficient Delivery: The complex pipeline replacement project was delivered on schedule within a 7-day window, minimizing community and environmental impact.
-
Gold-Standard Quality: A 100% weld acceptance rate and flawless pressure test ensure the long-term pipeline integrity management of this critical asset.
Client Testimonial:
“Facing this high-pressure pipeline encroachment issue next to a sensitive heritage site was a significant challenge. JSW’s team presented a technically brilliant yet practical plan centered on safety and continuity. Their execution was flawless—they delivered a permanent solution without shutting down our line for a single minute. They turned a major risk into a model of safe infrastructure management.”
— Project Manager, Wuxin Pipeline Operating Company
Our Expertise: Your Solution for Complex Pipeline Integrity Challenges
The successful resolution of the Wuxin Pipeline encroachment at Huxi Ancestral Hall wasn’t an isolated achievement—it was a direct demonstration of JSW’s core capabilities in transforming high-risk infrastructure problems into engineered, reliable solutions. We specialize in the most demanding scenarios where safety, precision, and operational continuity cannot be compromised.
Why Partner with Us for Your Next Critical Project?
As a leading specialist in pipeline integrity management and advanced pipeline services, we bring a unique combination of engineering excellence and field-proven execution to every project:
-
Deep Technical Expertise in High-Stakes Environments: Whether it’s pipeline encroachment remediation, inline inspection support, or complex pipeline repair, our engineers have tackled the most challenging scenarios—from heritage sites to dense urban corridors and environmentally sensitive areas. We don’t just follow standards; we develop the methodologies to exceed them.
-
Proven Zero-Interruption Technologies: Our mastery of Hot Tapping & Plugging (Double and Single-Sided), Pipeline Freezing, and Composite Repair ensures that your essential services continue uninterrupted. We measure our success by your operational uptime.
-
Full-Cycle Project Leadership, From Assessment to Compliance: We offer end-to-end services:
-
Risk Assessment & Engineering Design: Detailed feasibility studies, route optimization, and bespoke engineering for pipeline relocation and replacement projects.
-
Precision Execution: Managed by seasoned project leaders, utilizing certified technicians and certified equipment.
-
Validation & Documentation: Comprehensive testing, as-built documentation, and support for regulatory compliance closure.
-
Facing a Seemingly Impossible Pipeline Challenge?
If your asset is compromised by third-party encroachment, requires life-extension without shutdown, or needs a complex repair under pressure, you don’t need just a contractor—you need a strategic engineering partner.
Contact our solutions team today for a confidential, no-obligation review of your project requirements. Send us your pipeline diagrams, challenge description, or regulatory notice, and we will provide a preliminary assessment of the most effective and economical solution.






















