Project Snapshot:

CategoryDetalles
ClientInternational Energy Major (EPC Project)
LocationNingbo, China
Core ChallengeExecute 12 hot taps on live, high-pressure (7.0 MPa) natural gas and high-temperature (300°C) thermal oil pipelines made of high-grade steel (X60/L415Q) with thick, non-standard walls, without shutdown.
JSW SolutionCustom-engineered hot tapping services, including design/fabrication of heavy-duty fittings, stringent welding procedures, and deployment of proprietary high-capacity drilling equipment. A full-scope EPC support service.
Key ResultsZero shutdowns achieved. 100% success rate on all connections. Flawless safety record. Client’s expansion timeline and continuous production guaranteed.

Project Challenge: Performing “Heart Bypass Surgery” on a Live “Energy Artery”

For any major LNG receiving terminal, its internal pipeline system is a vital “energy artery” where failure is not an option. When our client — a leading international energy company — advanced the third-phase expansion and modification EPC project at its Ningbo Terminal, they faced a critical pipeline modification challenge: adding new connections to live pipelines carrying 300°C thermal oil and high-pressure natural gas (up to 7.0 MPa) without a single shutdown.

A full shutdown would have meant staggering production losses, measured in millions per day. The technical hurdles were formidable:

  • Extreme Parameters: Simultaneous high-temperature (300°C) hot tapping on thermal oil lines and high-pressure (7.0 MPa) hot tapping on gas lines.
  • Demanding Materials: Working on high-grade steel (X60, L415Q) pipelines with non-standard diameters (D717, D660) and extra-thick walls (up to 30mm pipe, 50mm fitting reinforcement).
  • Zero-Margin for Error: Operations were on critical infrastructure where safety and integrity were paramount. Any flaw in welding or the under-pressure drilling process could lead to catastrophic failure.

They needed more than just a contractor; they needed a partner with proven expertise in specialized pipeline hot tapping services capable of handling such a complex EPC scope. That’s where JSW Pipeline Services was engaged.

Red hot tapping equipment (with four-way fitting) being installed on industrial pipeline during EPC pipeline modification project, with workers and lifting gear on site
Pipeline system (with elbow) connected to hot tapping equipment, with scaffolding and crane at EPC pipeline modification site

Our Solution: A Tailored Engineering Protocol for Precision Live Intervention

As a company that is both a specialized pipeline services contractor and a manufacturer of related equipment, JSW approached this not as a standard job, but as an engineered project. Our solution was a multi-layered, custom-designed protocol:

1. Engineered Fitting & Advanced Welding:
We designed and fabricated full-encirclement split tees with 50mm-thick reinforcing pads to manage stress. Our certified welders executed stringent Welding Procedure Specifications (WPS) for X60 and L415Q materials, involving pre-heat, controlled interpass temperature, and Post Weld Heat Treatment (PWHT) where necessary, all monitored and documented to ensure integrity equal to the parent pipe.

2. Proprietary Hot Tapping Equipment:
We deployed our own large-stroke, high-torque hot tapping machines (JSW-HT Series), specifically designed for thick-wall pipeline drilling. These machines feature enhanced stability and cutting tool technology to handle the high-grade steel efficiently and safely under full pressure.

3. Rigorous Risk-Mitigated Execution Plan:
Every hot tap service was preceded by a Job Safety Analysis (JSA) and a detailed “hold point” procedure. Our methodology for under pressure drilling included dual-valve isolation, pilot hole verification, and continuous pressure monitoring throughout the cutting process.

Implementation: Flawless Execution Through Military-Grade Precision

Our role as the specialist EPC pipeline services partner involved seamless integration with the main contractor’s schedule. The key phases were:

  • Phase 1: Fit-for-Purpose Preparation. Site surveys, procedure qualification, and fit-up of custom fittings using laser alignment for perfect orientation.
  • Phase 2: Critical Welding Campaign. Execution of thick-wall welds under controlled conditions, followed by 100% Non-Destructive Testing (NDT) via Ultrasonic Testing (UT) and Radiographic Testing (RT).
  • Phase 3: The Live Tap. Mounting the tapping machine, pressure testing the assembly, and performing the pipeline hot tapping. The drilling of the D717 high-pressure gas line was a pinnacle moment, requiring meticulous control as the cutter penetrated the 19.1mm thick X60 steel under 7.0 MPa.
  • Phase 4: Completion & Handover. Machine retrieval, installation of the completion plug, final testing, and corrosion coating application. All waste (coupons) was safely contained and removed.
Red hot tapping device integrated with industrial pipeline system in EPC pipeline modification project site
Workers operating lifting gear to assist hot tapping equipment installation on high-pressure pipeline during EPC pipeline services

Results & Benefits: Delivering Quantifiable Value Beyond the Task

The success of this pipeline modification service was measured in safety, reliability, and economics.

Quantifiable Outcomes:

  • Zero Safety or Environmental Incidents: Perfect HSE record throughout the project.
  • 100% Operational Continuity: All 12 hot taps were completed without requiring a shutdown, saving the client an estimated multi-million-dollar loss in potential production downtime.
  • 100% Success Rate: All connections were completed on schedule, passed all integrity tests, and are fully operational.
  • Future-Proof Design: The installed tee fittings with internal debris filters ensure no interference with future pipeline inspection gauges (PIGs).

Client Feedback:
“The JSW team managed our most critical pipeline intervention with outstanding professionalism. Their dual capability as equipment makers and field specialists was evident. They engineered solutions for our unique thick-wall, high-pressure taps, not just applied standard tools. Their work ensured our expansion stayed on track without disrupting terminal operations for even a minute.”
— Project Manager, Client EPC Team

Why JSW Pipeline Services is Your Trusted Partner

This Ningbo Terminal project exemplifies the core of JSW. We are not just a service company; we are a technology-integrated contractor. As both manufacturers and practitioners, we control the entire value chain—from designing the right equipment for the job to executing the field work with unparalleled know-how.

Our service portfolio includes:

  • Hot Tapping & Plugging Services: For all diameters, pressures, and media.
  • Pipeline Emergency Response & Repair: 24/7 readiness for urgent interventions.
  • Pipeline Commissioning & Modifications: Supporting EPC projects globally.
  • Preventive Maintenance & Integrity Solutions: Extending asset lifecycles.

We combine engineering excellence with field-proven experience to deliver pipeline solutions that are safe, efficient, and economically superior.

Solicite una consulta gratuita sobre el servicio de tuberías

¿Listo para trabajar juntos? Construya un proyecto con nosotros

Más información

¿Se enfrenta a un problema de tuberías? Obtenga una solución a medida de nuestros expertos. Facilítenos sus datos a continuación y nos pondremos en contacto con usted en menos de 24 horas para hablar de los requisitos, los plazos y el presupuesto de su proyecto.

Beijing Jinshiwan es un proveedor líder integrado de tecnología y servicios para oleoductos y gasoductos, que combina la fabricación de equipos de alta gama con conocimientos profesionales de ingeniería. Ofrecemos soluciones de tuberías seguras, fiables e innovadoras durante todo el ciclo de vida para los sectores petrolífero y gasístico, químico y de servicios públicos de todo el mundo.

Construcción e instalación de tuberías
  • Construcción de oleoductos transfronterizos
  • Instalación y puesta en servicio de tuberías
  • Instalación de sistemas de tuberías de planta
  • Reubicación y modificación de tuberías
  • Servicios de roscado en caliente y roscado a presión
  • Servicios de taponamiento y aislamiento de tuberías
  • Reparación urgente de tuberías
  • Rehabilitación y revestimiento de tuberías
  • Reparación de manguitos compuestos (instalación de manguitos B)
  • Protección contra la corrosión y reparación
  • Gestión de la integridad de las tuberías
  • Servicios de apoyo a la inspección en línea
  • Modificaciones no disruptivas de la línea viva
  • Pruebas de presión de tuberías
  • Limpieza y secado de tuberías
  • Fabricación de roscadoras en caliente
  • Producción de equipos de taponamiento de tuberías
  • Fabricación de accesorios de tubería a medida
  • Fabricación de válvulas especiales

- Capacidad de respuesta en caso de emergencia 24 horas al día, 7 días a la semana
- Cumplimiento de las normas API y ASME
- Gestión multilingüe de proyectos
- Envíos internacionales y apoyo logístico
- Supervisión técnica in situ en todo el mundo

Proyectos de JSW Pipeline Service

Servicio de oleoductos

Confianza y valor

Nuestros clientes