Projects

JSW Recent Project Briefing

Pressurized-Plugging-Project-for-φ168-Purified-Oil-Pipeline-at-Oil-Production-Plant

01 Yulin, Shaanxi (June 20)
The pressurized plugging project for the φ168 purified oil pipeline at the No.8 Oil Production Plant of Changqing Oilfield Branch was successfully completed.

Pressurized-Plugging-Project-for-φ168-Purified-Oil-Pipeline-at-Oil-Production-Plant-1
Pressurized-Plugging-Project-for-φ168-Purified-Oil-Pipeline-at-Oil-Production-Plant-2

02 Jiujiang, Jiangxi (July 20)
The Jiujiang Oil Depot facility upgrade project was finalized.

Jiujiang-Oil-Depot-Facility-Upgrade-Project-1
Jiujiang-Oil-Depot-Facility-Upgrade-Project-2

03 Tianjin (June 26)
The anti-corrosion repair for two defect sites on the Nanpaihe 711 gas pipeline was successfully executed.

Anti-Corrosion-Project-for-2-Defect-Sites-on-Nanpaihe-711-Gas-Pipeline-2
Anti-Corrosion-Project-for-2-Defect-Sites-on-Nanpaihe-711-Gas-Pipeline-1

04 Longkou, Shandong (July 4)
The in-service plugging and metering device installation project for the gas pipeline at Longkou Conglin Aluminum Factory was smoothly completed.

Hot-Tapping-and-Metering-Installation-Project-for-In-Service-Gas-Pipeline-2
Hot-Tapping-and-Metering-Installation-Project-for-In-Service-Gas-Pipeline-1

05 Meizhou, Guangdong (Shanmei Expressway Expansion)
The pipeline relocation project involving three pressurized plugging points has completed the plugging phase, with oil extraction currently in progress.

Shanmei-Expressway-Expansion---Pipeline-Encroachment-Plugging-and-Rerouting-Project-4
Shanmei-Expressway-Expansion---Pipeline-Encroachment-Plugging-and-Rerouting-Project-3
Shanmei-Expressway-Expansion---Pipeline-Encroachment-Plugging-and-Rerouting-Project-2
Shanmei-Expressway-Expansion---Pipeline-Encroachment-Plugging-and-Rerouting-Project-1

06 Tianjin (Refinery Division)
The installation of jet fuel filter cartridges has commenced for the new filtration system at the Northern Terminal Station of the φ426 long-distance pipeline.

Jet-Fuel-Filter-Addition-Project-for-φ426-Long-Distance-Pipeline-at-Northern-Terminal-Station-1
Jet-Fuel-Filter-Addition-Project-for-φ426-Long-Distance-Pipeline-at-Northern-Terminal-Station-2

07 Linhai, Taizhou, Zhejiang
The high-pressure gas pipeline pressurized plugging project for Linhai China Resources Gas Co., Ltd. has begun, with current progress including:

  • Corrosion coating removal
  • T-joint assembly
Pressurized-Plugging-Project-for-High-Pressure-Gas-Pipeline