Reubicación sin cortes de un gasoducto DN400 crítico para la ampliación de la autopista de Fuquan

Puesta en servicio del equipo de toma en caliente y taponamiento del gasoducto de gas natural de alta presión DN400 durante su traslado (Fuzhou, 2023)

Project Spotlight: 

Detalles
ClientFujian Natural Gas Co., Ltd. (A subsidiary of CNOOC)
LocationCangshan District, Fuzhou City, Fujian Province, China
DateApril 18 – May 18, 2023
Core ChallengeRelocate 1,450 meters of live DN400 natural gas pipeline operating at 4.0 MPa that was obstructed by highway expansion construction, with zero interruption to downstream gas supply and strict adherence to 30-day timeline.
JSW SolutionSegmented live double block and bleed (DBB) hot tapping and plugging technology with temporary bypass installation, executed in two phases across multiple work zones, utilizing JSW proprietary high-pressure equipment and certified welding procedures.
Key ResultComplete pipeline relocation of 1,821.7 meters completed on schedule with 100% gas supply continuity, zero safety incidents, and all welds passing pressure integrity tests, enabling uninterrupted highway construction progress.

The Challenge: A High-Stakes Conflict Between Infrastructure and Energy Supply

In the bustling district of Cangshan, Fuzhou, a major infrastructure upgrade—the widening of the Fuquan Expressway connecting line—posed a direct threat to a vital energy artery. A DN400 natural gas pipeline (Φ406×7.9mm, L415 steel), operating at 4.0 MPa, lay directly in the path of planned interchange ramps and a rotary. Approximately 1,450 meters of this high-pressure pipeline was either encroached upon or situated perilously beneath the footprint of new concrete pile foundations.

For the asset owner, Fujian Natural Gas Co., Ltd., the dilemma was severe. A conventional shutdown-and-relocate approach would mean cutting off gas supply to downstream users for an extended period, resulting in significant commercial losses and community disruption. The pipeline relocation was non-negotiable for the highway project, but the cost of interruption was unacceptable. The client needed a pipeline services contractor capable of executing a live pipeline intervention that guaranteed:

  • Zero supply interruption to end-users.
  • Absolute safety for personnel and the public during construction adjacent to and underneath highway infrastructure.
  • Precise execution on a tight, 30-day timeline to align with the highway construction schedule.
  • Technical excellence in working with high-grade L415 steel and maintaining the integrity of the 3PE coating.
Workers performing hot tapping and plugging on L415 DN400 high-pressure natural gas pipeline during the pipeline relocation project for highway expansion (Fuzhou, 2023)
Crane and workers installing hot tapping & plugging equipment on DN400 L415 natural gas pipeline in the pipeline relocation construction site (Fuzhou, 2023)

The JSW Solution: Precision Engineering with Live Double Block and Bleed Technology

As a specialized pipeline services company and equipment manufacturer, JSW proposed a technically advanced and operationally safe solution: a segmented live hot tapping and plugging operation using the Double Block and Bleed (DBB) method. This approach allowed us to install temporary bypasses and isolate sections of the live line for cutting and tie-in, all while gas continued to flow uninterrupted through the mainline.

Our custom-engineered solution addressed every client concern:

  1. Comprehensive Pre-Engineering Survey & Planning: Before any fieldwork, our engineers conducted a detailed survey alongside the client’s team. We mapped every hot tapping and plugging point (4 points across 2 segments), designed the temporary pipeline bypass installation route, and planned all excavation and shoring for the high-pressure work pits, hot tap pits, and tie-in pits in the challenging urban-soil conditions of Anping and Huji villages.
  2. Deployment of Proprietary Hot Tapping & Plugging Equipment: We utilized JSW-manufactured split-tee fittings, high-pressure tapping machines, and plugging heads specifically rated for the pipeline’s 7.5 MPa design pressure. Our equipment’s reliability was non-negotiable for this live pipeline intervention.
  3. Phased, Risk-Mitigated Execution Plan: The project was strategically divided into two phases—Qingliang Village segment followed by Anping/Huji segment—to manage resources and risk effectively, aligning perfectly with the client’s node.
Trabajadores montando el equipo de toma en caliente para la intervención en directo en el gasoducto DN400 L415 de gas natural durante el proyecto de traslado (Fuzhou, 2023).
Trabajadores montando un equipo de doble bloqueo y purga en un gasoducto de gas natural de alta presión DN400 (proyecto de reubicación del gasoducto de Fuzhou, 2023).

The Execution: A Symphony of Technical Skill and Project Management

The implementation demonstrated JSW’s dual strength as a hands-on contractor and a master project manager.

Phase 1: Qingliang Village Segment (15-Day Sprint)

  • Days 1-7: Upon site handover, our crew immediately executed safe excavation and hydraulic shoring for all critical work pits. Simultaneously, we set up site facilities and prepared the first pipeline section.
  • Day 8: A formal joint construction condition confirmation with the client ensured all safety and technical prerequisites were met—a step that builds trust and prevents errors.
  • Days 9-15: The core hot tapping and plugging sequence began:
    1. Precision Welding: Certified welders performed in-service welding of JSW split-tee fittings onto the live L415 steel pipeline, following stringent procedures to prevent burn-through.
    2. Roscado en caliente: Using our tapping machines, we safely drilled into the 4.0 MPa gas stream to create connections for the bypass.
    3. Bypass Installation & Commissioning: A pre-fabricated temporary bypass line was installed and pressurized, becoming the new flow path for the gas.
    4. Plugging & Isolation: Plugging heads were inserted through the tees to create a double block and bleed isolation on the old pipeline section.
    5. Cutting, Tie-in & Restoration: The isolated old pipe section was cut, the new DN400 natural gas pipeline segment was welded in place, and the site was restored. Upon completion, the process was reversed to transfer flow back to the new permanent line.

Phase 2: Anping & Huji Village Segment (15-Day Execution)
Following the same disciplined protocol, our mobilized team replicated the success in the second, more complex area with multiple highway encroachments. The experience gained in Phase 1 allowed for even smoother execution, demonstrating the scalability of our pipeline services.

Preparación de la instalación de derivación de la tubería después de la toma en caliente en la tubería de gas natural DN400 (proyecto de reubicación de la ampliación de la autopista, 2023)
Trabajadores llevando a cabo la toma en caliente multipunto y el taponamiento en el gasoducto de gas natural DN400 L415 durante la construcción de la reubicación (Fuzhou, 2023).

Results & Benefits: Quantifiable Success and Strengthened Partnership

The JSW team delivered a textbook example of a complex pipeline relocation for highway expansion. The results speak for themselves:

  • 100% Gas Supply Continuity: Achieved zero interruptions in natural gas delivery to the community and industries throughout the entire pipeline relocation process.
  • Flawless Safety Record: Completed over 1,821 meters of new high-pressure pipeline construction and all live intervention work with zero safety incidents, despite working in confined pits near live traffic.
  • On-Time, On-Budget Delivery: All work was completed within the stringent 30-day window (April 18 – May 18, 2023), ensuring no delays for the critical highway construction project.
  • Technical Excellence Validated: The integrity of all welds and the new pipeline section passed all non-destructive testing (NDT) and pressure tests on the first attempt.

Client Testimonial:
“The highway expansion was on a critical path, and the thought of a pipeline shutdown was untenable. JSW didn’t just offer a service; they provided a guaranteed solution. Their expertise in hot tapping and plugging pipeline technology turned a high-risk problem into a seamless operation. Their team’s professionalism, from engineering to execution, was exceptional. They were a true partner, not just a contractor.”
— Project Manager, Fujian Natural Gas Co., Ltd. (Simulated)

Soldadura de accesorios de tubería para el equipo de toma en caliente en el gasoducto de gas natural de alta presión DN400 L415 (sitio de reubicación del gasoducto, 2023)
Workers sealing pipe ends after hot tapping & plugging on DN400 natural gas pipeline (highway expansion relocation project, 2023)

About JSW Pipeline Services

JSW is a global leader in specialized pipeline services and an innovative manufacturer of pipeline intervention equipment. We bridge the gap between engineering and execution for the world’s most demanding energy and utility assets.

Our Services Include:

  • Live Pipeline Interventions: Hot Tapping, Plugging, Line Stopping, Pipeline Bypass Installation.
  • Pipeline Modifications: Natural Gas Pipeline Relocation, Replacement, and High-Pressure Pipeline Construction.
  • Emergency Response & Maintenance: Leak Repair, Valve Insertion, Pipeline Integrity Management.

Why Choose JSW?
We combine the hands-on reliability of a top-tier field contractor with the technical precision of an equipment OEM. This unique position allows us to design and execute solutions that are not only effective but also optimally efficient and safe. When you face a challenge involving live pipeline intervention or complex pipeline relocation, partner with the experts who build the tools and master the techniques.

Ready to discuss your pipeline challenge? Contact JSW Pipeline Services today for a confidential consultation.

Solicite una consulta gratuita sobre el servicio de tuberías

¿Listo para trabajar juntos? Construya un proyecto con nosotros

Más información

¿Se enfrenta a un problema de tuberías? Obtenga una solución a medida de nuestros expertos. Facilítenos sus datos a continuación y nos pondremos en contacto con usted en menos de 24 horas para hablar de los requisitos, los plazos y el presupuesto de su proyecto.

Beijing Jinshiwan es un proveedor líder integrado de tecnología y servicios para oleoductos y gasoductos, que combina la fabricación de equipos de alta gama con conocimientos profesionales de ingeniería. Ofrecemos soluciones de tuberías seguras, fiables e innovadoras durante todo el ciclo de vida para los sectores petrolífero y gasístico, químico y de servicios públicos de todo el mundo.

Construcción e instalación de tuberías
  • Construcción de oleoductos transfronterizos
  • Instalación y puesta en servicio de tuberías
  • Instalación de sistemas de tuberías de planta
  • Reubicación y modificación de tuberías
  • Servicios de roscado en caliente y roscado a presión
  • Servicios de taponamiento y aislamiento de tuberías
  • Reparación urgente de tuberías
  • Rehabilitación y revestimiento de tuberías
  • Reparación de manguitos compuestos (instalación de manguitos B)
  • Protección contra la corrosión y reparación
  • Gestión de la integridad de las tuberías
  • Servicios de apoyo a la inspección en línea
  • Modificaciones no disruptivas de la línea viva
  • Pruebas de presión de tuberías
  • Limpieza y secado de tuberías
  • Fabricación de roscadoras en caliente
  • Producción de equipos de taponamiento de tuberías
  • Fabricación de accesorios de tubería a medida
  • Fabricación de válvulas especiales

- Capacidad de respuesta en caso de emergencia 24 horas al día, 7 días a la semana
- Cumplimiento de las normas API y ASME
- Gestión multilingüe de proyectos
- Envíos internacionales y apoyo logístico
- Supervisión técnica in situ en todo el mundo